Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Periodic Inspections of Cleveland Harbor East Breakwater, Ohio, and Burns Harbor North Breakwater, Indiana
Monitoring Completed Navigation Projects (MCNP) Program evaluates the structural and functional performance of existing navigation structures. Under Periodic Inspections, aerial photography, ground-truth surveys, walking inspections, photogrammetry, and lidar elevation data are used to periodically assess the structural conditions of selected structures. A database of these structures is being compiled for asset management and other purposes. Cleveland Harbor East Breakwater, OH, has sustained extensive damage since its construction in 1915. The Breakwater has had an extensive repair history, including a major rehabilitation in 1979 80 involving the placement of 2-ton dolosse on the lakeward slope and crest of the easterly 4,400 feet (ft). Some failed and were replaced with 4-ton dolosse. Other repairs took place in 1986, 1989, 1991, and 2001 on the nondolos sections. Burns Harbor North Breakwater, IN, is a 4,640 ft rubble-mound structure constructed in 1969. The Breakwater has required extensive maintenance including the addition of 290 kilotons of stone through 1989. A submerged reef was constructed between 1995 and 1998, 75 ft lakeward of the Breakwater, to reduce wave energy reaching the structure.
Periodic Inspections of Cleveland Harbor East Breakwater, Ohio, and Burns Harbor North Breakwater, Indiana
Monitoring Completed Navigation Projects (MCNP) Program evaluates the structural and functional performance of existing navigation structures. Under Periodic Inspections, aerial photography, ground-truth surveys, walking inspections, photogrammetry, and lidar elevation data are used to periodically assess the structural conditions of selected structures. A database of these structures is being compiled for asset management and other purposes. Cleveland Harbor East Breakwater, OH, has sustained extensive damage since its construction in 1915. The Breakwater has had an extensive repair history, including a major rehabilitation in 1979 80 involving the placement of 2-ton dolosse on the lakeward slope and crest of the easterly 4,400 feet (ft). Some failed and were replaced with 4-ton dolosse. Other repairs took place in 1986, 1989, 1991, and 2001 on the nondolos sections. Burns Harbor North Breakwater, IN, is a 4,640 ft rubble-mound structure constructed in 1969. The Breakwater has required extensive maintenance including the addition of 290 kilotons of stone through 1989. A submerged reef was constructed between 1995 and 1998, 75 ft lakeward of the Breakwater, to reduce wave energy reaching the structure.
Periodic Inspections of Cleveland Harbor East Breakwater, Ohio, and Burns Harbor North Breakwater, Indiana
G. B. Myrick (Autor:in) / J. A. Melby (Autor:in) / E. C. Burg (Autor:in)
2015
122 pages
Report
Keine Angabe
Englisch
Periodic Inspection of Cleveland Harbor East Breakwater, Ohio
UB Braunschweig | 1995
|