National Program for Inspection of Non-Federal Dams. Upper Glen (Greenfield) Reservoir Dam (MA 00049), Connecticut River Basin, Leyden, Massachusetts. Phase I Inspection Report
Upper Glen (Greenfield) Reservoir Dam is 48 foot high composite masonry and rock fill embankment dam. Its crest is approximately 270 feet long, the upstream face is nearly vertical, the top width is about 19 feet and the stepped rock-fill slope averages 1H:1V. The dam appears to be in good overall condition. The recommended range for the test flood for an 'Intermediate' size, 'Significant' hazard dam is from 1/2 of the PMF. (Author)
National Program for Inspection of Non-Federal Dams. Upper Glen (Greenfield) Reservoir Dam (MA 00049), Connecticut River Basin, Leyden, Massachusetts. Phase I Inspection Report
Upper Glen (Greenfield) Reservoir Dam is 48 foot high composite masonry and rock fill embankment dam. Its crest is approximately 270 feet long, the upstream face is nearly vertical, the top width is about 19 feet and the stepped rock-fill slope averages 1H:1V. The dam appears to be in good overall condition. The recommended range for the test flood for an 'Intermediate' size, 'Significant' hazard dam is from 1/2 of the PMF. (Author)
National Program for Inspection of Non-Federal Dams. Upper Glen (Greenfield) Reservoir Dam (MA 00049), Connecticut River Basin, Leyden, Massachusetts. Phase I Inspection Report
1981
101 pages
Report