National Program for Inspection of Non-Federal Dams. Sebec Dam ME 00163, Penobscot River Basin, Sebec, Maine. Phase I Inspection Report
The dam is about 276 ft. long with a height of 16 ft. The dam is considered to be in fair condition. Continued spalling and erosion of the gate structure concrete could eventually compromise its structural stability. It is large in size with a hazard classification of significant. It is recommended that the owner engage a qualified engineer to further assess the spalled and eroded concrete of the old power station and fishway. (Author)
National Program for Inspection of Non-Federal Dams. Sebec Dam ME 00163, Penobscot River Basin, Sebec, Maine. Phase I Inspection Report
The dam is about 276 ft. long with a height of 16 ft. The dam is considered to be in fair condition. Continued spalling and erosion of the gate structure concrete could eventually compromise its structural stability. It is large in size with a hazard classification of significant. It is recommended that the owner engage a qualified engineer to further assess the spalled and eroded concrete of the old power station and fishway. (Author)
National Program for Inspection of Non-Federal Dams. Sebec Dam ME 00163, Penobscot River Basin, Sebec, Maine. Phase I Inspection Report
1981
89 pages
Report
Keine Angabe
Englisch
Civil Engineering , Dams , Visual inspection , Safety , Deficiencies , Concrete , Structural properties , Power , Stations , Stability , Erosion , Hazards , Maine , Basins(Geographic) , Rivers , Sebec Dam , National Dam Inspection Program