Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rehabilitation of Clemson Upper Diversion Dam Contract NO. DACW21-83-c-0066 Construction Foundation Report
This volume consists of 4 appendices: Boring logs -- 'New Piezometers'; Concrete quality control -- Core boring logs; Piezometer plots; and Inclinometer plots. Dams foundations structures; Engineering geology; Construction materials; Clemson Dam rehabilitation; Hartwell Lake. (edc)
Rehabilitation of Clemson Upper Diversion Dam Contract NO. DACW21-83-c-0066 Construction Foundation Report
This volume consists of 4 appendices: Boring logs -- 'New Piezometers'; Concrete quality control -- Core boring logs; Piezometer plots; and Inclinometer plots. Dams foundations structures; Engineering geology; Construction materials; Clemson Dam rehabilitation; Hartwell Lake. (edc)
Rehabilitation of Clemson Upper Diversion Dam Contract NO. DACW21-83-c-0066 Construction Foundation Report
1989
242 pages
Report
Keine Angabe
Englisch
Deep Soil Mixing for Seismic Remediation of the Clemson Upper and Lower Diversion Dams
British Library Conference Proceedings | 2005
|Evaluation and Design of Seismic Remediation for the Clemson Upper and Lower Diversion Dams
British Library Conference Proceedings | 2003
|