Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Puyallup Hatchery Pond and Pumping Plant Construction
The project provided for the construction of four concrete ponds; two 1/4 acre ponds which were asphalt lined; reconstruction of the existing rack and fishway and incorporating a pump intake with them; installation of three pumps; and connecting them to distribution lines to the new ponds.
Puyallup Hatchery Pond and Pumping Plant Construction
The project provided for the construction of four concrete ponds; two 1/4 acre ponds which were asphalt lined; reconstruction of the existing rack and fishway and incorporating a pump intake with them; installation of three pumps; and connecting them to distribution lines to the new ponds.
Puyallup Hatchery Pond and Pumping Plant Construction
R. K. Jones (Autor:in)
1972
12 pages
Report
Keine Angabe
Englisch
Skykomish Hatchery Pond Construction
NTIS | 1971
|The Construction of the Puyallup River Bridge at Tacoma, Washington
British Library Conference Proceedings | 1997
|Shear-Wave Velocity Correlations for Puyallup River Alluvium
British Library Online Contents | 2010
|Arch dam 390 ft. High for Puyallup river project
Engineering Index Backfile | 1937
One-Dimensional Modeling of Sedimentation Processes on the Puyallup River
British Library Conference Proceedings | 2009
|