Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge Management System. Phase 1. Final Report
A research project was conducted for the South Carolina Department of Highways and Public Transportation (SCDHPT) to evaluate the Pontis bridge management system (BMS) software package and formulate BMS implementation recommendations. The research team conducted a literature review, attended various BMS conferences, met with the software developers, and contacted persons in other states who were performing similar evaluations. A 75 bridge database was createdthat utilized South Carolina NBI data and cost and bridge element transition data that were supplied with the Pontis program. A large number of Pontis reports were generated and evaluated. The data requirements of Pontis were also carefully examined.
Bridge Management System. Phase 1. Final Report
A research project was conducted for the South Carolina Department of Highways and Public Transportation (SCDHPT) to evaluate the Pontis bridge management system (BMS) software package and formulate BMS implementation recommendations. The research team conducted a literature review, attended various BMS conferences, met with the software developers, and contacted persons in other states who were performing similar evaluations. A 75 bridge database was createdthat utilized South Carolina NBI data and cost and bridge element transition data that were supplied with the Pontis program. A large number of Pontis reports were generated and evaluated. The data requirements of Pontis were also carefully examined.
Bridge Management System. Phase 1. Final Report
F. A. Ruinen (Autor:in) / L. C. Bell (Autor:in)
1993
64 pages
Report
Keine Angabe
Englisch