Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 5, Dewatering report. Revised final report
This report provides an update on dewatering activities at the Durango disposal embankment and presents recommendations for the work required to complete the closure of the cell in 1990 (Section 2). In October 1989, test pit investigations were performed and a toe trench was excavated at the eastern slope of the disposal embankment. A description and results of the test pit investigations along with the implications . of the results relative to the over . all dewatering effort are discussed in Sections 3 through 5. Installation and performance of the 17-well dewatering system were previously described in' the ''StatusReport on Dewatering of Disposal Embankment'' issued in September, 1989. Additional studies are still on-going and are described in Section 6. Laboratory analysis continues on samples taken from the test pits. TAC's characterization of the hydrogeological conditions at the Durango site is also proceeding. Results of these studies will be presented in subsequent reports. Appendices A and B present construction details of the well point system, toe trench and holding pond. Appendix C summarizes the performance-of the 17 pumping wells prior to winter shutdown and provides information on pumping rates, drawdowns, and disposition of the wells. Appendix D outlines the chronology of the dewatering effort to date.
Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 5, Dewatering report. Revised final report
This report provides an update on dewatering activities at the Durango disposal embankment and presents recommendations for the work required to complete the closure of the cell in 1990 (Section 2). In October 1989, test pit investigations were performed and a toe trench was excavated at the eastern slope of the disposal embankment. A description and results of the test pit investigations along with the implications . of the results relative to the over . all dewatering effort are discussed in Sections 3 through 5. Installation and performance of the 17-well dewatering system were previously described in' the ''StatusReport on Dewatering of Disposal Embankment'' issued in September, 1989. Additional studies are still on-going and are described in Section 6. Laboratory analysis continues on samples taken from the test pits. TAC's characterization of the hydrogeological conditions at the Durango site is also proceeding. Results of these studies will be presented in subsequent reports. Appendices A and B present construction details of the well point system, toe trench and holding pond. Appendix C summarizes the performance-of the 17 pumping wells prior to winter shutdown and provides information on pumping rates, drawdowns, and disposition of the wells. Appendix D outlines the chronology of the dewatering effort to date.
Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 5, Dewatering report. Revised final report
1991
36 pages
Report
Keine Angabe
Englisch