Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Criteria and Guidelines for Evacuating Storage Reservoirs and Sizing Low-Level Outlet Works
The determination of reservoir evacuation rates, initial filling rates, and the sizing of low-level outlet works are important design considerations for storage dams. The document presents Bureau of Reclamation policy pertaining to requirements for evacuating storage reservoirs and for sizing low-level outlet works. The two-part document addresses evacuation rates and facilities. Part I contains evacuation criteria for Bureau of Reclamation storage reservoirs. Part II contains guidelines which provide methods of evaluating site-specific conditions in compliance with the Bureau of Reclamation's criteria.
Criteria and Guidelines for Evacuating Storage Reservoirs and Sizing Low-Level Outlet Works
The determination of reservoir evacuation rates, initial filling rates, and the sizing of low-level outlet works are important design considerations for storage dams. The document presents Bureau of Reclamation policy pertaining to requirements for evacuating storage reservoirs and for sizing low-level outlet works. The two-part document addresses evacuation rates and facilities. Part I contains evacuation criteria for Bureau of Reclamation storage reservoirs. Part II contains guidelines which provide methods of evaluating site-specific conditions in compliance with the Bureau of Reclamation's criteria.
Criteria and Guidelines for Evacuating Storage Reservoirs and Sizing Low-Level Outlet Works
1990
34 pages
Report
Keine Angabe
Englisch
Multilevel Outlet Works at Four Existing Reservoirs
ASCE | 2021
|Small and Medium Size Dam Air Vent Sizing for Low-Level Outlet Works
British Library Conference Proceedings | 2010
|