Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Initial Formulation Results for in Situ Grouting of a Waste Trench at ORNL Site No. 6
An investigation is being conducted by the Chemical Technology Division to assist the Environmental Sciences Division in developing a grout formulation for use in testing in situ grouting in a waste trench at ORNL Site 6. This final report satisfies the milestone of Subtack 12 entitled, ''Low Level Waste (LLW) Trench Grouting Assessment,'' which was initially issued as RAP-86-7, December 31, 1985. Grouts prepared from dry-solid blends containing Type I Portland cement, ASTM Class C or Class F fly ash, and bentonite, mixed water at ratios of 10 to 15 lb/gal, were evaluated. The grouts prepared with ASTM Class C fly ash exhibited significantly better properties than those prepared with ASTM Class F fly ash. The grouts containing ASTM Class C fly ash satisfy tentative performance criteria for the project. 8 refs., 7 tabs. (ERA citation 12:010949)
Initial Formulation Results for in Situ Grouting of a Waste Trench at ORNL Site No. 6
An investigation is being conducted by the Chemical Technology Division to assist the Environmental Sciences Division in developing a grout formulation for use in testing in situ grouting in a waste trench at ORNL Site 6. This final report satisfies the milestone of Subtack 12 entitled, ''Low Level Waste (LLW) Trench Grouting Assessment,'' which was initially issued as RAP-86-7, December 31, 1985. Grouts prepared from dry-solid blends containing Type I Portland cement, ASTM Class C or Class F fly ash, and bentonite, mixed water at ratios of 10 to 15 lb/gal, were evaluated. The grouts prepared with ASTM Class C fly ash exhibited significantly better properties than those prepared with ASTM Class F fly ash. The grouts containing ASTM Class C fly ash satisfy tentative performance criteria for the project. 8 refs., 7 tabs. (ERA citation 12:010949)
Initial Formulation Results for in Situ Grouting of a Waste Trench at ORNL Site No. 6
O. K. Tallent (Autor:in) / E. W. McDaniel (Autor:in) / R. D. Spence (Autor:in) / T. T. Godsey (Autor:in)
1987
19 pages
Report
Keine Angabe
Englisch
In Situ Grouting of a Low-Level Radioactive Waste Trench
NTIS | 1987
|Site characterization of ORNL D&D facilities
NTIS | 1994
|Radioactive Waste Trench Grouting - A Case History at Oak Ridge National Laboratory
British Library Conference Proceedings | 1997
|