Evaluation of closure alternatives for the Building 3001 Storage Canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program
The Bldg. 3001 Storage Canal at ORNL is leaking approximately 400 gal of water per day. This report presents the Bechtel National Inc. (BNI) Team's evaluation of plans and presents recommendations for interim closure alternatives to stop the release of radionuclides and potential release of heavy metals into the environment. This is a conceptual evaluation and does not include detailed engineering of physical mitigation methods. The alternatives address only interim closure measures and not final decommissioning of the canal.
Evaluation of closure alternatives for the Building 3001 Storage Canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program
The Bldg. 3001 Storage Canal at ORNL is leaking approximately 400 gal of water per day. This report presents the Bechtel National Inc. (BNI) Team's evaluation of plans and presents recommendations for interim closure alternatives to stop the release of radionuclides and potential release of heavy metals into the environment. This is a conceptual evaluation and does not include detailed engineering of physical mitigation methods. The alternatives address only interim closure measures and not final decommissioning of the canal.
Evaluation of closure alternatives for the Building 3001 Storage Canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program
1992
82 pages
Report
Keine Angabe
Englisch
Environmental Pollution & Control , Radiation Pollution & Control , Radioactive Effluents , X-10 Reactor , Cost , Environmental Exposure Pathway , Joints , Radiation Doses , Radiation Monitoring , Radioactive Waste Management , Radionuclide Migration , Recommendations , Shielding , Shutdown , Heavy metals , Closures , EDB/540230 , EDB/220600 , EDB/220502