Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Length and End Slope Considerations, Interim Design Guidance Update for Nearshore Berm Construction
This note updates length and end slope considerations presented in Dredging Research Technical Notes DRP-5-02, 'Interim Design Guidance for Nearshore Berm Construction' (McLellan, Kraus, and Burke 1990). Presented are preliminary results of a numerical analysis applied to generic berm configurations, which highlight berm effects on the local wave climate. Dredging Research Program (DRP) monitoring and modeling work units will continue to update this guidance as the data base and predictive techniques are improved.
Length and End Slope Considerations, Interim Design Guidance Update for Nearshore Berm Construction
This note updates length and end slope considerations presented in Dredging Research Technical Notes DRP-5-02, 'Interim Design Guidance for Nearshore Berm Construction' (McLellan, Kraus, and Burke 1990). Presented are preliminary results of a numerical analysis applied to generic berm configurations, which highlight berm effects on the local wave climate. Dredging Research Program (DRP) monitoring and modeling work units will continue to update this guidance as the data base and predictive techniques are improved.
Length and End Slope Considerations, Interim Design Guidance Update for Nearshore Berm Construction
1992
11 pages
Report
Keine Angabe
Englisch
Design Guidance for Nearshore Berms: Crest Length and End Slope Considerations
British Library Conference Proceedings | 1992
|Nearshore Berm Discussion Environmental Impacts
NTIS | 2013
|Influence of Nearshore Berm on Beach Nourishment
ASCE | 1997
|