Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel Cost Model
The Tunnel Cost Model, developed at MIT's Department of Civil Engineering, follows in concept the current estimating practices of contractors, owners, and designers. It is able to treat explicitly many of the major uncertainties of tunnel construction, and its speed and level of detail make it ideal for evaluating alternatives in tunnel site location or method of construction. Because it can operate at several levels of detail, the Tunnel Cost Model adapts readily to the diverse needs of contractors, owners, construction managers, and engineers. This brochure highlights the main features of the model.
Tunnel Cost Model
The Tunnel Cost Model, developed at MIT's Department of Civil Engineering, follows in concept the current estimating practices of contractors, owners, and designers. It is able to treat explicitly many of the major uncertainties of tunnel construction, and its speed and level of detail make it ideal for evaluating alternatives in tunnel site location or method of construction. Because it can operate at several levels of detail, the Tunnel Cost Model adapts readily to the diverse needs of contractors, owners, construction managers, and engineers. This brochure highlights the main features of the model.
Tunnel Cost Model
1975
22 pages
Report
Keine Angabe
Englisch
Tunnel Cost Model: Users' Manual
NTIS | 1975
|Tunnel Cost Model: Executive Summary
NTIS | 1978
|Tunnel Cost Model: Final Report
NTIS | 1978
|Tunnel Cost-Estimating Methods
NTIS | 1981
|Immersed tunnel cost reduction
British Library Conference Proceedings | 1994
|