Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The builder worked with IBACOS to build 20 HERS-58 homes with R-49 mixed attic insulation, poly-iso foam in advanced framed walls, precast concrete basement walls with rigid foam, tight airsealing, and HRV
The builder worked with IBACOS to build 20 HERS-58 homes with R-49 mixed attic insulation, poly-iso foam in advanced framed walls, precast concrete basement walls with rigid foam, tight airsealing, and HRV
New Whole-house Solutions Case Study: Tindall Homes, Columbus, New Jersey
None (Autor:in)
2012
2 pages
Report
Keine Angabe
Englisch
New Whole-house Solutions Case Study: Quadrant Homes
NTIS | 2013
|The Hub, Benjamin Tindall Architects
British Library Online Contents | 2000