Hanford operations, February 1952
This document summarizes Hanford Operations activities during the month of February 1952. There were 17 slug failures during the month. At least 7 process tubes leaked water into the piles. Process tubes have been removed from wet sections of the piles and found to be seriously corroded and pitted.
Hanford operations, February 1952
This document summarizes Hanford Operations activities during the month of February 1952. There were 17 slug failures during the month. At least 7 process tubes leaked water into the piles. Process tubes have been removed from wet sections of the piles and found to be seriously corroded and pitted.