Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Evaluation of Portland Cement Concrete Pavement with High Slag Content Cement, June 2009
The performance of a section of concrete pavement built with 30 percent Ground Granulated Blast Furnace Slag (GGBFS) is compared to a control section of concrete pavement built with 25 percent GGBFS to determine if the higher slag content pavement is more resistant to wear from studded tires. This report details the construction of the pavement, construction quality control tests, and initial base line wear, friction, and smoothness results.
Evaluation of Portland Cement Concrete Pavement with High Slag Content Cement, June 2009
The performance of a section of concrete pavement built with 30 percent Ground Granulated Blast Furnace Slag (GGBFS) is compared to a control section of concrete pavement built with 25 percent GGBFS to determine if the higher slag content pavement is more resistant to wear from studded tires. This report details the construction of the pavement, construction quality control tests, and initial base line wear, friction, and smoothness results.
Evaluation of Portland Cement Concrete Pavement with High Slag Content Cement, June 2009
K. W. Anderson (Autor:in) / J. S. Uhlmeyer (Autor:in) / K. Williams (Autor:in) / M. Russell (Autor:in) / J. Weston (Autor:in)
2009
36 pages
Report
Keine Angabe
Englisch
Portland cement concrete pavement evaluation systems : copes
TIBKAT | 1985
|Portland cement concrete pavement evaluation system ; copes
UB Braunschweig | 1985
Portland Cement Concrete Pavement Texturing Methods
British Library Online Contents | 1996
|