Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
National Program for Inspection of Non-Federal Dams. First Herring Brook Reservoir Dam (MA 00478) Massachusetts Coastal Basin, Scituate, Massachusetts. Phase 1 Inspection Report
The first Herring Brook Reserrvior Dam consists of an earth embankment with a concrete core wall. The embankment has a top width of 20 ft. and a maximum height of 21.5 ft. The overall length of the dam is 700 ft., including a 42 ft. long concrete spillway. The dam is considered to be in fair condition. It has a size classification of small and a high hazard potential. It is recommended that the owner engage the services of a registered engineer to specify and oversee various procedures.
National Program for Inspection of Non-Federal Dams. First Herring Brook Reservoir Dam (MA 00478) Massachusetts Coastal Basin, Scituate, Massachusetts. Phase 1 Inspection Report
The first Herring Brook Reserrvior Dam consists of an earth embankment with a concrete core wall. The embankment has a top width of 20 ft. and a maximum height of 21.5 ft. The overall length of the dam is 700 ft., including a 42 ft. long concrete spillway. The dam is considered to be in fair condition. It has a size classification of small and a high hazard potential. It is recommended that the owner engage the services of a registered engineer to specify and oversee various procedures.
National Program for Inspection of Non-Federal Dams. First Herring Brook Reservoir Dam (MA 00478) Massachusetts Coastal Basin, Scituate, Massachusetts. Phase 1 Inspection Report
1981
103 pages
Report
Keine Angabe
Englisch