Idaho Falls, City Hydroelectric Power Plant: Preliminary Report
Feasibility studies for the Idaho Falls City Hydroelectric Power Plant are reported. Presented are the results of studies of four alternatives, an environmental evaluation of the site, and a recommended plan for redevelopment of the site. It is concluded that installation of one 7200-kW bulb turbine-generator is technically and economically feasible and the most attractive of the alternatives investigated. Furthermore, since the City Power Plant is part of an overall three-plant project, installing three identical units of 7200 kW, one at each site, is recommended. (ERA citation 03:034707)
Idaho Falls, City Hydroelectric Power Plant: Preliminary Report
Feasibility studies for the Idaho Falls City Hydroelectric Power Plant are reported. Presented are the results of studies of four alternatives, an environmental evaluation of the site, and a recommended plan for redevelopment of the site. It is concluded that installation of one 7200-kW bulb turbine-generator is technically and economically feasible and the most attractive of the alternatives investigated. Furthermore, since the City Power Plant is part of an overall three-plant project, installing three identical units of 7200 kW, one at each site, is recommended. (ERA citation 03:034707)
Idaho Falls, City Hydroelectric Power Plant: Preliminary Report
1978
170 pages
Report