Construction quality assurance report for the prototype surface barrier
This construction quality assurance (CQA) report follows the requirements of the prototype surface barrier CQA plan, describes the construction work sequence, and reports significant inspection activities for project W-263 and construction of the barrier over the 21 6-B-57 Crib. This report compiles the material testing into tabulation and block evaluations and reports the compliance requirements for each separate construction work activity (e.g., subgrade, composite asphalt barrier, and drainage layer).
Construction quality assurance report for the prototype surface barrier
This construction quality assurance (CQA) report follows the requirements of the prototype surface barrier CQA plan, describes the construction work sequence, and reports significant inspection activities for project W-263 and construction of the barrier over the 21 6-B-57 Crib. This report compiles the material testing into tabulation and block evaluations and reports the compliance requirements for each separate construction work activity (e.g., subgrade, composite asphalt barrier, and drainage layer).
Construction quality assurance report for the prototype surface barrier
M. A. Buckmaster (Autor:in)
1995
595 pages
Report
Keine Angabe
Englisch
Quality assurance in construction
TIBKAT | 1996
|Quality assurance in construction
TIBKAT | 1990
Quality Assurance during Construction Process
British Library Conference Proceedings | 2004
|Quality Assurance in Construction Projects
British Library Conference Proceedings | 1994
|Quality Assurance in Highway Construction
NTIS | 1990
|