Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Chloe Pavement Serviceability Program. Research Program No. 1
The report emphasizes two main areas of effort: work performed on a profilometer unit in order to make it operational, and operating procedures followed in use of the unit in 1967 and 1968. Once the unit had been made operational, the profilometer was used to establish pavement serviceability indices for selected sections of roadway in pursuance of the goals of determining standards of pavement condition and of finding a means of determining when pavements should be resurfaced or reconstructed. (Author)
Chloe Pavement Serviceability Program. Research Program No. 1
The report emphasizes two main areas of effort: work performed on a profilometer unit in order to make it operational, and operating procedures followed in use of the unit in 1967 and 1968. Once the unit had been made operational, the profilometer was used to establish pavement serviceability indices for selected sections of roadway in pursuance of the goals of determining standards of pavement condition and of finding a means of determining when pavements should be resurfaced or reconstructed. (Author)
Chloe Pavement Serviceability Program. Research Program No. 1
H. T. Tateishi (Autor:in) / P. Hironaga (Autor:in) / C. Takamoto (Autor:in) / L. Imada (Autor:in)
1969
158 pages
Report
Keine Angabe
Englisch
Civil Engineering , Roads , Pavements , Test equipment , Maintainability , Standards , Deterioration , Measurement , Meters , Hawaii , Profilometers
Better concrete pavement serviceability
TIBKAT | 1973
|Pavement Roughness and Serviceability
NTIS | 1971
|Pavement Roughness and Serviceability
NTIS | 1972
|Evaluation of Pavement Serviceability
NTIS | 1973
|Pavement Roughness and Serviceability
NTIS | 1975
|