Disposal of fluidized-bed combustion ash in an underground mine to control acid mine drainage and subsidence. Quarterly report, March 1--May 31, 1996
During Phase 1 (first 18 months) the project is segregated into four areas of reporting: (A) Grout Formulation, (B) Grout Characterization, (C) Water Quality Monitoring, (D) Subsidence Control and Contaminant Transport. The first component involves formulating a grout mixture with appropriate flowability to be used in filling complex mine voids. The Grout Characterization component will determine the flow characteristics of the formulated grout. The Water Quality component involves background monitoring of water quality and precipitation at the Phase 3 (Longridge) mine site. The last component involves evaluating the strength requirements and the migration of contaminants through the candidate grouts. This report separately discusses progress on all components of the program in order of project subtask.
Disposal of fluidized-bed combustion ash in an underground mine to control acid mine drainage and subsidence. Quarterly report, March 1--May 31, 1996
During Phase 1 (first 18 months) the project is segregated into four areas of reporting: (A) Grout Formulation, (B) Grout Characterization, (C) Water Quality Monitoring, (D) Subsidence Control and Contaminant Transport. The first component involves formulating a grout mixture with appropriate flowability to be used in filling complex mine voids. The Grout Characterization component will determine the flow characteristics of the formulated grout. The Water Quality component involves background monitoring of water quality and precipitation at the Phase 3 (Longridge) mine site. The last component involves evaluating the strength requirements and the migration of contaminants through the candidate grouts. This report separately discusses progress on all components of the program in order of project subtask.
Disposal of fluidized-bed combustion ash in an underground mine to control acid mine drainage and subsidence. Quarterly report, March 1--May 31, 1996
1996
25 pages
Report
Keine Angabe
Englisch