Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Central Loading Point with a Main Bunker and a Secondary Bunker
The construction of a central loading point with a main bunker and a secondary bunker is described. The central loading point was installed for the purpose of levelling production peaks and interruptions of winning in the main winning area. The projecting steps, the construction work, and the technical data of the bunker are described. (ERA citation 10:012208)
Central Loading Point with a Main Bunker and a Secondary Bunker
The construction of a central loading point with a main bunker and a secondary bunker is described. The central loading point was installed for the purpose of levelling production peaks and interruptions of winning in the main winning area. The projecting steps, the construction work, and the technical data of the bunker are described. (ERA citation 10:012208)
Central Loading Point with a Main Bunker and a Secondary Bunker
1983
11 pages
Report
Keine Angabe
Englisch
Bunker und Festung - Bunker et fortification - Editorial
Online Contents | 1999
UB Braunschweig | 2015
|UB Braunschweig | 1994
|TIBKAT | 2006
|British Library Online Contents | 2005
|