Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
In this FHWA-sponsored pool funded study, a set of decision making tools, based on the Analytic Hierarchy Process (AHP) was developed. This tool set is prepared for transportation specialists and decision-makers to determine if ABC is more effective than traditional construction for a given bridge replacement or rehabilitation project. The tool set is user-friendly, flexible to accommodate a range of construction situations, transparent as to the method of calculation, and customizable to maintain future relevance. To accommodate this task, a comprehensive literature review on a number of relevant domains such as ABC construction techniques and decision making approaches, were completed. The findings were summarized into a decision model hierarchy that was also incorporated into the decision making software. The software was tested through evaluating a set of real-world construction projects.
In this FHWA-sponsored pool funded study, a set of decision making tools, based on the Analytic Hierarchy Process (AHP) was developed. This tool set is prepared for transportation specialists and decision-makers to determine if ABC is more effective than traditional construction for a given bridge replacement or rehabilitation project. The tool set is user-friendly, flexible to accommodate a range of construction situations, transparent as to the method of calculation, and customizable to maintain future relevance. To accommodate this task, a comprehensive literature review on a number of relevant domains such as ABC construction techniques and decision making approaches, were completed. The findings were summarized into a decision model hierarchy that was also incorporated into the decision making software. The software was tested through evaluating a set of real-world construction projects.
Accelerated Bridge Construction (ABC) Decision Making and Economic Modeling Tool
2011
201 pages
Report
Keine Angabe
Englisch
Decision Making and Economic Analysis for Accelerated Bridge Construction
Tema Archiv | 2013
|Decision Making and Economic Analysis for Accelerated Bridge Construction
Trans Tech Publications | 2013
|Accelerated Bridge Construction
ASCE | 2020
|Accelerated Bridge Construction (ABC), A Better Approach to Bridge Construction?
BASE | 2016
|Iowa Accelerated Bridge Construction (ABC) Connections
NTIS | 2015
|