Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fatigue Crack Modeling in Bridge Deck Connection Details
Many steel bridges built prior to 1960 have bridge deck connections that are subject o high cycle fatigue. These connections may be nearing their fatigue limit and will require increased inspection and repair over the next 10-20 years. Current inspection and repair are very expensive and only address those details which contain visible cracks. The goal of this research was to develop a methodology to identify problem details - those which are nearing the end of their serviceable life, but may not yet contain visible cracks. One Oregon bridge on Interstate 5 with this problem was studied to assess the loading conditions and fatigue crack growth rate for the connection details. The objective was to use the analysis from this bridge to develop a predictive model of connection detail fatigue life, which could be applied to other bridges. Such a model could be used to guide the inspection and repair process, significantly reducing costs.
Fatigue Crack Modeling in Bridge Deck Connection Details
Many steel bridges built prior to 1960 have bridge deck connections that are subject o high cycle fatigue. These connections may be nearing their fatigue limit and will require increased inspection and repair over the next 10-20 years. Current inspection and repair are very expensive and only address those details which contain visible cracks. The goal of this research was to develop a methodology to identify problem details - those which are nearing the end of their serviceable life, but may not yet contain visible cracks. One Oregon bridge on Interstate 5 with this problem was studied to assess the loading conditions and fatigue crack growth rate for the connection details. The objective was to use the analysis from this bridge to develop a predictive model of connection detail fatigue life, which could be applied to other bridges. Such a model could be used to guide the inspection and repair process, significantly reducing costs.
Fatigue Crack Modeling in Bridge Deck Connection Details
R. K. Paasch (Autor:in) / A. H. DePiero (Autor:in)
1999
68 pages
Report
Keine Angabe
Englisch
Finite-Element Modeling of Bridge Deck Connection Details
Online Contents | 2002
|Bridge deck fatigue crack monitoring method, device and system
Europäisches Patentamt | 2023
|Modelling and fatigue life assessment of orthotropic bridge deck details using FEM
British Library Online Contents | 2012
|Modelling and fatigue life assessment of orthotropic bridge deck details using FEM
Tema Archiv | 2012
|DECK WOOD CONNECTION AND DECK WOOD BRIDGE INCLUDING SUCH DECK WOOD CONNECTION
Europäisches Patentamt | 2015
|