Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
U.S. Army Corps of Engineers Recreation Study. A Plan Prepared for the Assistant Secretary of the Army (Civil Works). Volume 1. Main Report
The U.S. Army Corps of Engineers conducted a review of its outdoor recreation program. The objective was to develop a plan for maintaining or enhancing recreation while reducing Federal expenditures. Volume I: Main Report summarizes the study purpose and scope, provides an historical review of the Corps involvement in outdoor recreation and a comparison with other Federal and non-Federal recreation providers, describes the study process, reports on the evaluation of options and describes a recommended plan. Volume II: Appendices contains supporting material developed during the study process. (mm)
U.S. Army Corps of Engineers Recreation Study. A Plan Prepared for the Assistant Secretary of the Army (Civil Works). Volume 1. Main Report
The U.S. Army Corps of Engineers conducted a review of its outdoor recreation program. The objective was to develop a plan for maintaining or enhancing recreation while reducing Federal expenditures. Volume I: Main Report summarizes the study purpose and scope, provides an historical review of the Corps involvement in outdoor recreation and a comparison with other Federal and non-Federal recreation providers, describes the study process, reports on the evaluation of options and describes a recommended plan. Volume II: Appendices contains supporting material developed during the study process. (mm)
U.S. Army Corps of Engineers Recreation Study. A Plan Prepared for the Assistant Secretary of the Army (Civil Works). Volume 1. Main Report
1990
157 pages
Report
Keine Angabe
Englisch
TECHNICAL PAPERS - Condition Index Assessment for US Army Corps of Engineers Civil Works
Online Contents | 1999
|TECHNICAL PAPERS - Condition Index Assessment for US Army Corps of Engineers Civil Works
Online Contents | 1999
|