Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geotechnical Investigations of the PEP Site
The purpose of this paper is to summarize the general nature of the geology and rock and soil formations of the PEP site as they relate to the design and construction of the project; to describe site investigation programs and to catalog the geotechnical information presently available about the site. The recently-completed investigation of subterranean conditions around the PEP ring when coupled with previous surveys gives us a good understanding of what to expect with regard to tunneling, undertaking larger underground excavations and constructing research halls in the interaction areas. It bears out the predictions made in Jacobs and Associates' report of 1973; i.e., that the ring housing construction is classified as soft-ground tunneling and that large underground openings, such as region 10 and the injection junction structures, will require great attention to support. A shield or shields will probably be required. On the positive side, the site affords very good conditions for soft-ground tunneling. Water will be a problem in some areas, but not an unsolvable one. The possibility of encountering lethal or explosive gases, almost always the case in tunneling in California's coastal formations, exists but has not been ascertained. Finally, no reasons to change current cost estimates or schedules have merged from the investigation. 13 refs., 1 fig.
Geotechnical Investigations of the PEP Site
The purpose of this paper is to summarize the general nature of the geology and rock and soil formations of the PEP site as they relate to the design and construction of the project; to describe site investigation programs and to catalog the geotechnical information presently available about the site. The recently-completed investigation of subterranean conditions around the PEP ring when coupled with previous surveys gives us a good understanding of what to expect with regard to tunneling, undertaking larger underground excavations and constructing research halls in the interaction areas. It bears out the predictions made in Jacobs and Associates' report of 1973; i.e., that the ring housing construction is classified as soft-ground tunneling and that large underground openings, such as region 10 and the injection junction structures, will require great attention to support. A shield or shields will probably be required. On the positive side, the site affords very good conditions for soft-ground tunneling. Water will be a problem in some areas, but not an unsolvable one. The possibility of encountering lethal or explosive gases, almost always the case in tunneling in California's coastal formations, exists but has not been ascertained. Finally, no reasons to change current cost estimates or schedules have merged from the investigation. 13 refs., 1 fig.
Geotechnical Investigations of the PEP Site
R. S. Gould (Autor:in)
1976
12 pages
Report
Keine Angabe
Englisch
Measuring the Risk of Geotechnical Site Investigations
ASCE | 2007
|Measuring the Risk of Geotechnical Site Investigations
British Library Conference Proceedings | 2007
|NTIS | 2001
Undertaking geotechnical investigations
Emerald Group Publishing | 1985
|