Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. The examinatin of documents and visual inspection of the Mill Brook Site 1 Dam did not reveal conditions which constitute a hazard to human life or property. The total discharge capacity of the spillways is adequate to impound and safely discharge the floodwaters resulting from the Probable Maximum Flood (PMF).
This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. The examinatin of documents and visual inspection of the Mill Brook Site 1 Dam did not reveal conditions which constitute a hazard to human life or property. The total discharge capacity of the spillways is adequate to impound and safely discharge the floodwaters resulting from the Probable Maximum Flood (PMF).
National Dam Safety Program. Millbrook Watershed Project Site I (Inventory Number NY 715) Susquehanna River Basin, Chenango County, New York. Phase I Inspection Report
G. Koch (Autor:in)
1980
94 pages
Report
Keine Angabe
Englisch