Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Final report for interim stabilization of REDOX railroad cut (UPR-200-W-41)
This report describes the demolition of the 2706-S Building, the placement of concrete blocks near the REDOX canyon railroad door, the activities performed by Dyncorp Electrical Utilities, and the interim stabilization of the contaminated area near the REDOX Facility.
Final report for interim stabilization of REDOX railroad cut (UPR-200-W-41)
This report describes the demolition of the 2706-S Building, the placement of concrete blocks near the REDOX canyon railroad door, the activities performed by Dyncorp Electrical Utilities, and the interim stabilization of the contaminated area near the REDOX Facility.
Final report for interim stabilization of REDOX railroad cut (UPR-200-W-41)
C. D. Sherman (Autor:in)
2000
16 pages
Report
Keine Angabe
Englisch
Soil Stabilization Field Trial, Interim Report 3
NTIS | 2003
Soil Stabilization Field Trial, Interim Report 2
NTIS | 2002
|Soil stabilization for erosion control : interim report
TIBKAT | 1974
|Root cuttings for roadside slope stabilization : interim report
TIBKAT | 1972
|