Maintenance Dredging, Noyo River Channel, Noyo Harbor, Mendocino County, California
The project proposes to dredge approximately 60,000 cubic yards of material during Fiscal Year 1974. Dredged material will be placed on Corps of Engineers designated land disposal site. Continued maintenance will be necessary at approximately one to two-year intervals. Environmental impacts include distruption of bottom sediments during dredging; removal of bottom organisms; increase in turbidity in adjacent water; possible release of heavy metals during dredging. The maintenance will preserve the harbor for use as a recreational and commercial fishing port as well as a natural harbor refuge. Five acres of grassland upstream will be covered with dredged material.
Maintenance Dredging, Noyo River Channel, Noyo Harbor, Mendocino County, California
The project proposes to dredge approximately 60,000 cubic yards of material during Fiscal Year 1974. Dredged material will be placed on Corps of Engineers designated land disposal site. Continued maintenance will be necessary at approximately one to two-year intervals. Environmental impacts include distruption of bottom sediments during dredging; removal of bottom organisms; increase in turbidity in adjacent water; possible release of heavy metals during dredging. The maintenance will preserve the harbor for use as a recreational and commercial fishing port as well as a natural harbor refuge. Five acres of grassland upstream will be covered with dredged material.
Maintenance Dredging, Noyo River Channel, Noyo Harbor, Mendocino County, California
1973
22 pages
Report
Keine Angabe
Englisch
Noyo River and Harbor, California, Design for Harbor Entrance Protection.Coastal Model Investigation
UB Braunschweig | 1994
|