Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Canal-Lining Demonstration Project Year 7 Durability Report
The Deschutes Canal-Lining Demonstration Project is a cooperative effort among the Bureau of Reclamation, several irrigation districts, and several geosynthetic, lining manufacturers. The purpose of this study is to develop low-cost canal-lining technologies to reduce seepage over severe rocky subgrade conditions. The 27 test sections include combinations of geosynthetics, soil, concrete grout, shotcrete, roller compacted concrete, elastomeric coatings, and sprayed-in-place foam. This report assesses the performance of 22 test sections after 1 1/2 to 7 years of service. This report also documents the construction of five additional tests sections.
Canal-Lining Demonstration Project Year 7 Durability Report
The Deschutes Canal-Lining Demonstration Project is a cooperative effort among the Bureau of Reclamation, several irrigation districts, and several geosynthetic, lining manufacturers. The purpose of this study is to develop low-cost canal-lining technologies to reduce seepage over severe rocky subgrade conditions. The 27 test sections include combinations of geosynthetics, soil, concrete grout, shotcrete, roller compacted concrete, elastomeric coatings, and sprayed-in-place foam. This report assesses the performance of 22 test sections after 1 1/2 to 7 years of service. This report also documents the construction of five additional tests sections.
Canal-Lining Demonstration Project Year 7 Durability Report
J. Swihart (Autor:in) / J. Haynes (Autor:in)
1999
178 pages
Report
Keine Angabe
Englisch
Civil Engineering , Construction Equipment, Materials, & Supplies , Natural Resource Management , Hydrology & Limnology , Deschutes River , Canal linings , Water conservation , Durability , Geotechnical materials , Soils , Grouts , Foams , Elastomers , Concrets , Permeability , Canal seepage , Service life , Maintenance , Leakage , Ponding , Irrigation districts , Cost benefit analysis , Life cycle costs , Geotechnical engineering , Demonstration programs , Oregon , Geosynthetic materials , Geocomposites , Geomembranes
Canal-Lining Demonstration Project Year 10 Final Report
NTIS | 2002
|Deschutes Canal Lining Demonstration - Construction Report
British Library Conference Proceedings | 1994
|