Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PCP Cracking and Bridge Deck Reinforcement: An Interim Report
TxDOT Project 0-6348 'Controlling Cracking in Prestressed Concrete Panels and Optimizing Bridge Deck Reinforcing Steel' started on September 1, 2008 and is scheduled to end on August 31, 2012. The project is proceeding on schedule. This report summarizes research progress to date, and lists the principal findings.
PCP Cracking and Bridge Deck Reinforcement: An Interim Report
TxDOT Project 0-6348 'Controlling Cracking in Prestressed Concrete Panels and Optimizing Bridge Deck Reinforcing Steel' started on September 1, 2008 and is scheduled to end on August 31, 2012. The project is proceeding on schedule. This report summarizes research progress to date, and lists the principal findings.
PCP Cracking and Bridge Deck Reinforcement: An Interim Report
R. E. Klinger (Autor:in) / O. Bayrak (Autor:in) / J. O. Jirsa (Autor:in) / S. Chao (Autor:in)
2010
37 pages
Report
Keine Angabe
Englisch
Bridge Deck Reinforcement and PCP Cracking: Final Report
NTIS | 2013
|Bridge Deck Expansion Devices. Second Interim Report
NTIS | 1985
|COMPUTER MODELING OF BRIDGE DECK CRACKING
British Library Conference Proceedings | 2008
|Deck Cracking of Shelby Creek Bridge
British Library Conference Proceedings | 1995
|