Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction Management System. Volume IV. Construction Office Operations Manual
Volume IV, Construction Office Operations Manual, is to be used by the AHTD Construction Division for maintenance and use of the Construction Management System. Specifically, the manual addresses the necessary steps for the maintenance of the Basic Scheduling System, the Long-Range Forecasting System, the equipment predictor, and the construction engineering cost matrix.
Construction Management System. Volume IV. Construction Office Operations Manual
Volume IV, Construction Office Operations Manual, is to be used by the AHTD Construction Division for maintenance and use of the Construction Management System. Specifically, the manual addresses the necessary steps for the maintenance of the Basic Scheduling System, the Long-Range Forecasting System, the equipment predictor, and the construction engineering cost matrix.
Construction Management System. Volume IV. Construction Office Operations Manual
1978
61 pages
Report
Keine Angabe
Englisch
Highway Engineering , Public Administration & Government , Transportation , Transportation & Traffic Planning , State government , Highways , Construction management , Engineering costs , Economic analysis , Scheduling , Manpower validation , Management analysis , Job analysis , Computer applications , Arkansas
Construction Office Automation. Volume 2
NTIS | 1988
|Prestressed Pavement Construction Manual, Volume 3
NTIS | 1983
|Construction operations management
TIBKAT | 1998
|