Investigation of Carbon Fiber Composite Cables (CFCC) in Prestressed Concrete Piles
The Florida Department of Transportation (FDOT) commonly uses prestressed concrete piles in bridge foundations. These piles are prestressed with steel strands that, when installed in aggressive or marine environments, are subject to corrosion and therefore rapid degradation. Many solutions may address this issue, but they are not long-term. Hence, it would be desirable to use advanced materials that do not corrode. The goal of this research was to assess the suitability of using carbon fiber composite cables (CFCC), which do not corrode, in lieu of conventional steel prestressing strands. Five (5) 24-in. square prestressed concrete piles, three (3) 40-ft long and two (2) 100-ft long, were cast using 0.6-in. diameter CFCC strands produced by Tokyo Rope Manufacturing Company. A special anchoring system was used because CFCC strands cannot be conventionally gripped using wedges and a jack. The techniques employed to prestress these strands were documented, as well as the unique aspects involved in constructing and precasting CFCC-prestressed piles. During strand detensioning, stresses were monitored in the concrete at the piles' ends to determine the transfer length of CFCC strands, as a means of evaluating their bond characteristics. Development length tests and flexural tests were performed on two (2) of the 40-ft piles at the FDOT Marcus H. Ansley Structures Research Center to further assess the performance of the CFCC strands. Lastly, the two (2) 100-ft piles were driven at a bridge construction site, adjacent to standard steel-prestressed concrete piles. During driving operations, the behavior of the piles was monitored using embedded data collectors and a Pile Driving Analyzer. The precasting efforts and test results show that the performance of piles prestressed with CFCC strands is comparable to those prestressed with steel. Using CFCC strands in prestressed concrete piles for bridge foundations, particularly in harsh environments, could potentially result in bridges that require less maintenance and have longer lifespans.
Investigation of Carbon Fiber Composite Cables (CFCC) in Prestressed Concrete Piles
The Florida Department of Transportation (FDOT) commonly uses prestressed concrete piles in bridge foundations. These piles are prestressed with steel strands that, when installed in aggressive or marine environments, are subject to corrosion and therefore rapid degradation. Many solutions may address this issue, but they are not long-term. Hence, it would be desirable to use advanced materials that do not corrode. The goal of this research was to assess the suitability of using carbon fiber composite cables (CFCC), which do not corrode, in lieu of conventional steel prestressing strands. Five (5) 24-in. square prestressed concrete piles, three (3) 40-ft long and two (2) 100-ft long, were cast using 0.6-in. diameter CFCC strands produced by Tokyo Rope Manufacturing Company. A special anchoring system was used because CFCC strands cannot be conventionally gripped using wedges and a jack. The techniques employed to prestress these strands were documented, as well as the unique aspects involved in constructing and precasting CFCC-prestressed piles. During strand detensioning, stresses were monitored in the concrete at the piles' ends to determine the transfer length of CFCC strands, as a means of evaluating their bond characteristics. Development length tests and flexural tests were performed on two (2) of the 40-ft piles at the FDOT Marcus H. Ansley Structures Research Center to further assess the performance of the CFCC strands. Lastly, the two (2) 100-ft piles were driven at a bridge construction site, adjacent to standard steel-prestressed concrete piles. During driving operations, the behavior of the piles was monitored using embedded data collectors and a Pile Driving Analyzer. The precasting efforts and test results show that the performance of piles prestressed with CFCC strands is comparable to those prestressed with steel. Using CFCC strands in prestressed concrete piles for bridge foundations, particularly in harsh environments, could potentially result in bridges that require less maintenance and have longer lifespans.
Investigation of Carbon Fiber Composite Cables (CFCC) in Prestressed Concrete Piles
K Joshi (Autor:in) / M Roddenberry (Autor:in) / P MMtenga (Autor:in)
2014
307 pages
Report
Keine Angabe
Englisch
Use of CFRP-CFCC Reinforcement in Prestressed Concrete Box-Beam Bridges
Online Contents | 2006
|Report on the Use of CFCC in Prestressed Concrete Bridges in Japan
British Library Conference Proceedings | 1993
|Strengthening concrete beams with externally prestressed carbon fiber composite cables
British Library Conference Proceedings | 2001
|