Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, Construction Documents for New Sanitary Sewer Construction. Volume 2
The primary objective of this interim response action is to prevent the potential spread of contamination via the sanitary sewer system. The IRA will consist of (1) Construction of a new sanitary sewer, and (2) Sealing of the existing sewer in the north plants and south plants areas along with the interceptor line in section 36. Sections and appendices of this final implementation plan include: (1) Background and overview of course of action; (2) Procedures for sealing the existing sewer lines with concrete; (3) Schedule of closure events; (4) Health and safety plan for closure of existing lines; (5) Specifications and plans for the new sanitary sewer; (6) Chemical, physical, and biological properties of contaminants; and (7) Request for proposals.
Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, Construction Documents for New Sanitary Sewer Construction. Volume 2
The primary objective of this interim response action is to prevent the potential spread of contamination via the sanitary sewer system. The IRA will consist of (1) Construction of a new sanitary sewer, and (2) Sealing of the existing sewer in the north plants and south plants areas along with the interceptor line in section 36. Sections and appendices of this final implementation plan include: (1) Background and overview of course of action; (2) Procedures for sealing the existing sewer lines with concrete; (3) Schedule of closure events; (4) Health and safety plan for closure of existing lines; (5) Specifications and plans for the new sanitary sewer; (6) Chemical, physical, and biological properties of contaminants; and (7) Request for proposals.
Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, Construction Documents for New Sanitary Sewer Construction. Volume 2
1990
136 pages
Report
Keine Angabe
Englisch
Water Pollution & Control , Solid Wastes Pollution & Control , Civil Engineering , Construction Equipment, Materials, & Supplies , Logistics Military Facilities & Supplies , Wastes(Sanitary engineering) , Sewers , Construction materials , Soil pollution , Construction , Bituminous coatings , Concrete , Contracts , Pipes , Costs , Colorado , Army facilities , Cements , Specifications , Hydrostatics , Aggregates(Materials) , Backfills , Excavation , Health , Safety , Soils , Contaminants , Rocky Mountain Arsenal , Leakage
Gravity sanitary sewer design and construction
TIBKAT | 2007
|British Library Conference Proceedings | 1998
Engineering Index Backfile | 1962
|