PBES Cost Study: Accelerated Bridge Construction Success Stories
The prefabricated bridge elements and systems (PBES) cost study documents the details related to savings in time and money on nine PBES projects in states across the country. All nine projects are replacement projects, and as such reducing the impact of onsite construction to motorists was a priority. Each project is an example of how various combinations of prefabrication and effective contracting strategies were used to achieve the accelerated onsite construction timeline. In all cases the onsite construction time was significantly reduced relative to conventional construction, and five of the replacement projects were completed with no impact to rushhour traffic. The combined construction cost savings on these nine projects is $30M, where savings are defined as the difference between engineer's estimate and awarded bid.
PBES Cost Study: Accelerated Bridge Construction Success Stories
The prefabricated bridge elements and systems (PBES) cost study documents the details related to savings in time and money on nine PBES projects in states across the country. All nine projects are replacement projects, and as such reducing the impact of onsite construction to motorists was a priority. Each project is an example of how various combinations of prefabrication and effective contracting strategies were used to achieve the accelerated onsite construction timeline. In all cases the onsite construction time was significantly reduced relative to conventional construction, and five of the replacement projects were completed with no impact to rushhour traffic. The combined construction cost savings on these nine projects is $30M, where savings are defined as the difference between engineer's estimate and awarded bid.
PBES Cost Study: Accelerated Bridge Construction Success Stories
2006
56 pages
Report
Keine Angabe
Englisch
Accelerated Bridge Construction
ASCE | 2020
|Springer Verlag | 2018
|Accelerated Bridge Construction (ABC), A Better Approach to Bridge Construction?
BASE | 2016
|Foundation Reuse in Accelerated Bridge Construction
ASCE | 2019
|Iowa Accelerated Bridge Construction (ABC) Connections
NTIS | 2015
|