During commisioning tests on Headgate Rock Generating Unit 3, two turn-to-turn insulation failures developed in the stator coils. The report describes the results of the evaluation of stator coils removed from Headgate Rock Generating Unit 3 following the turn-to-turn insulation failures. The evaluation was performed in the Bureau of Reclamation's Hydroelectric Research and Technical Services Laboratory in Denver, Colorado.
During commisioning tests on Headgate Rock Generating Unit 3, two turn-to-turn insulation failures developed in the stator coils. The report describes the results of the evaluation of stator coils removed from Headgate Rock Generating Unit 3 following the turn-to-turn insulation failures. The evaluation was performed in the Bureau of Reclamation's Hydroelectric Research and Technical Services Laboratory in Denver, Colorado.
Evaluation of Stator Coils Removed from Headgate Rock Generating Unit 3
L. Rux (Autor:in)
1995
45 pages
Report
Keine Angabe
Englisch
Electric Power Production , Miscellaneous Energy Conversion & Storage , Electromechanical Devices , Coil , Stators , Materials testing , Failure , Insulation resistance , Electrical insulation , Electric currents , Dielectric materials , HVDC systems , Hydroelectric power plants , Electric generators , Current testing , Headgate Rock Powerplant , Southwestern Region(Arizona)
Consequence of closure of headgate of head race canal containing surge tank
Engineering Index Backfile | 1963
|Maintenance of Water-cooled Generator Stator Coils during Outage
British Library Online Contents | 2009
|New Standard for Voltage Endurance Tests on Stator Coils and Bars
British Library Online Contents | 2004
|Graffiti removed from porous stone facade
Online Contents | 1994
Corrosion evaluation of gusset plate connection removed from steel truss bridge
British Library Conference Proceedings | 2015
|