Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Swamp Creek Interchange, Snohomish County, Washington. SR-525
SR 525 will be constructed on a new alignment from its junction with SR 5 at Swamp Creek Interchange to Martha Lake Road in Snohomish County. The facility will consist of a normal four lane roadway and auxiliary lanes with full access control and design features conforming to urban major type. The primary effect will be displacement of 39 families and loss of natural wooded area through right of way take necessary for construction of the facility. (Author)
Swamp Creek Interchange, Snohomish County, Washington. SR-525
SR 525 will be constructed on a new alignment from its junction with SR 5 at Swamp Creek Interchange to Martha Lake Road in Snohomish County. The facility will consist of a normal four lane roadway and auxiliary lanes with full access control and design features conforming to urban major type. The primary effect will be displacement of 39 families and loss of natural wooded area through right of way take necessary for construction of the facility. (Author)
Swamp Creek Interchange, Snohomish County, Washington. SR-525
1972
23 pages
Report
Keine Angabe
Englisch
Snohomish County, Washington builds modern airport
Engineering Index Backfile | 1940
|British Library Online Contents | 2012
|