Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WSSRAP chemical plant geotechnical investigations: Appendix A, Phase 1, Borehole, piezometer and test pit logs
This document has been prepared for the United States Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP). This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. This document, Appendix A, contains information for Phase I of WSSRAP for boreholes, piezometer and test pit logs.
WSSRAP chemical plant geotechnical investigations: Appendix A, Phase 1, Borehole, piezometer and test pit logs
This document has been prepared for the United States Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP). This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. This document, Appendix A, contains information for Phase I of WSSRAP for boreholes, piezometer and test pit logs.
WSSRAP chemical plant geotechnical investigations: Appendix A, Phase 1, Borehole, piezometer and test pit logs
1990
420 pages
Report
Keine Angabe
Englisch
Borehole television for geotechnical investigations
Tema Archiv | 1986
|GEOTECHNICAL INSTRUMENTATION NEWS - Update of the fully-grouted method for piezometer installation
Online Contents | 2012
|