Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Brief Reconnaissance Study for the Addition of Hydropower for Dorthea Dam, Lily, Kentucky
The feasibility of retrofitting the Dorthea Dam near Lily, Kentucky for power generation was examined. This dam has a developable head of 25 ft., was built in 1926 for electric power generation, and currently is used for a source of water supply. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is technically and economically feasible. (ERA citation 07:046125)
Brief Reconnaissance Study for the Addition of Hydropower for Dorthea Dam, Lily, Kentucky
The feasibility of retrofitting the Dorthea Dam near Lily, Kentucky for power generation was examined. This dam has a developable head of 25 ft., was built in 1926 for electric power generation, and currently is used for a source of water supply. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is technically and economically feasible. (ERA citation 07:046125)
Brief Reconnaissance Study for the Addition of Hydropower for Dorthea Dam, Lily, Kentucky
T. G. Gebhard (Autor:in)
1982
19 pages
Report
Keine Angabe
Englisch