Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cost-Effective Optimization of Rubble-Mound Breakwater Cross Sections
This report discusses design criteria, design procedures, and practical considerations involved in planning, design, and construction of rubble-mound breakwaters. Currently available methods for estimating rates of damage to breakwater armor and for predicting wave transmission characteristics are also described. Using information typically available today to most breakwater designers, a step-wide procedure is presented which can identify an optimum breakwater cross section, both in terms of structural integrity and functional performance.
Cost-Effective Optimization of Rubble-Mound Breakwater Cross Sections
This report discusses design criteria, design procedures, and practical considerations involved in planning, design, and construction of rubble-mound breakwaters. Currently available methods for estimating rates of damage to breakwater armor and for predicting wave transmission characteristics are also described. Using information typically available today to most breakwater designers, a step-wide procedure is presented which can identify an optimum breakwater cross section, both in terms of structural integrity and functional performance.
Cost-Effective Optimization of Rubble-Mound Breakwater Cross Sections
O. P. Smith (Autor:in)
1986
138 pages
Report
Keine Angabe
Englisch
Cost-effective optimization of rubble-mound breakwater cross sections
UB Braunschweig | 1986
|S-Curve Rubble Mound Breakwater
Springer Verlag | 2021
|S-Curve Rubble Mound Breakwater
TIBKAT | 2021
|RUBBLE-MOUND BREAKWATER CONSTRUCTION SIMULATION
TIBKAT | 2020
|