Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
This report was prepared by Hughes Associates, Inc. to document the results of fire models for building 221-T Canyon Deck and Railroad Tunnel. Backup data is contained in document No. WHC-SD-CP-ANAL-010, Rev. 0.
This report was prepared by Hughes Associates, Inc. to document the results of fire models for building 221-T Canyon Deck and Railroad Tunnel. Backup data is contained in document No. WHC-SD-CP-ANAL-010, Rev. 0.
Fire modeling for Building 221-T - T Plant Canyon Deck and Railroad Tunnel
D. L. Oar (Autor:in)
1994
121 pages
Report
Keine Angabe
Englisch
T Plant canyon deck-level allowable floor-load study
NTIS | 1995
|Rehabilitation of Railroad Canyon Dam
British Library Conference Proceedings | 1997
|Railroad Canyon Dam Overtopping Protection
British Library Conference Proceedings | 1995
|Concreting deck for Glen Canyon bridge
Engineering Index Backfile | 1959