Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Freeway Operations Study-Phase IV. Data Collection and Analysis for the Eastshore Freeway (I-80) Corridor
The report presents the results of a data collection effort on a freeway corridor. The procedures used for collecting and analyzing the data are presented. All data required for the evaluation of the surface street models and in the application of the developed freeway corridor model are enclosed.
Freeway Operations Study-Phase IV. Data Collection and Analysis for the Eastshore Freeway (I-80) Corridor
The report presents the results of a data collection effort on a freeway corridor. The procedures used for collecting and analyzing the data are presented. All data required for the evaluation of the surface street models and in the application of the developed freeway corridor model are enclosed.
Freeway Operations Study-Phase IV. Data Collection and Analysis for the Eastshore Freeway (I-80) Corridor
R. G. Dowling (Autor:in) / A. D. May (Autor:in)
1974
223 pages
Report
Keine Angabe
Englisch
Freeway and rapid transit share corridor
Engineering Index Backfile | 1968
|Full-Cost Analysis of the Katy Freeway Corridor
NTIS | 1996
|Accomplishments in freeway operations
TIBKAT | 1971
|Freeway operations : 4 reports
TIBKAT | 1967
|Freeway Management and Operations
NTIS | 1987
|