Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Specifications for a 25-Man Pioneer Polar Camp
A 25-man pioneer polar camp was developed to provide comfortable living conditions during initial phases of occupancy in the arctic and antarctic. The camp design includes structures, air conditioning, water supply, sanitation and other such facilities integrated to form a functional component. The buildings are out fitted for use as quarters, messing, galley, utilities, administration, communications, medical, head, laundry, storage and equipment maintenance. This technical note contains the specifications for the camp presented in the Naval Civil Engineering Laboraotory Report TR-267, A 25-Man Pioneer Polar Camp. (Author)
Specifications for a 25-Man Pioneer Polar Camp
A 25-man pioneer polar camp was developed to provide comfortable living conditions during initial phases of occupancy in the arctic and antarctic. The camp design includes structures, air conditioning, water supply, sanitation and other such facilities integrated to form a functional component. The buildings are out fitted for use as quarters, messing, galley, utilities, administration, communications, medical, head, laundry, storage and equipment maintenance. This technical note contains the specifications for the camp presented in the Naval Civil Engineering Laboraotory Report TR-267, A 25-Man Pioneer Polar Camp. (Author)
Specifications for a 25-Man Pioneer Polar Camp
G. E. Sherwood (Autor:in)
1963
85 pages
Report
Keine Angabe
Englisch
Logistics Military Facilities & Supplies , Military facilities , Polar regions , Installation , Polar , Logistics , Supply depots , Construction , Buildings , Air conditioning equipment , Water , Sanitary engineering , Structures , Specifications , Communication equipment , Medical equipment , Head(Anatomy) , Maintenance
TIBKAT | 1963
|Pioneer Polar Structures, Jamesway Building Divider
NTIS | 1965
|Flushing Chemical Toilet for Temporary Polar Camp
NTIS | 1964
|