Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Longitudinal Joint Repair
The report covers the construction evaluation of four methods of longitudinal joint repair: (A) Method A - Shallow trench; (B) Modified Method A - Shallow trench with sawed or preformed joint; (C) Method B - Deep trench; (D) Method C - Full depth. Results indicated that the Modified Method A with a sawed or preformed centerline joint was the most successful in repairing longitudinal centerline deterioration.
Longitudinal Joint Repair
The report covers the construction evaluation of four methods of longitudinal joint repair: (A) Method A - Shallow trench; (B) Modified Method A - Shallow trench with sawed or preformed joint; (C) Method B - Deep trench; (D) Method C - Full depth. Results indicated that the Modified Method A with a sawed or preformed centerline joint was the most successful in repairing longitudinal centerline deterioration.
Longitudinal Joint Repair
D. A. Maurer (Autor:in) / K. A. McManigle (Autor:in)
1986
50 pages
Report
Keine Angabe
Englisch
JOINT REPAIR METHOD, JOINT REPAIR STRUCTURE AND DRY JOINT MATERIAL
Europäisches Patentamt | 2023
|