Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Electrochemical Chloride Removal and Protection of Concrete Bridge Components: Field Trials
Electrochemical chloride removal procedures developed in the laboratory for rehabilitation of concrete bridge structures were executed in field validation trials. Field trials were completed on an Ohio bridge deck, a Florida marine column substructure, a New York land column substructure, and an Ontario bridge abutment. All four field trials were successful. This report discusses the results of these trials. (Copyright (c) 1993 National Academy of Sciences.)
Electrochemical Chloride Removal and Protection of Concrete Bridge Components: Field Trials
Electrochemical chloride removal procedures developed in the laboratory for rehabilitation of concrete bridge structures were executed in field validation trials. Field trials were completed on an Ohio bridge deck, a Florida marine column substructure, a New York land column substructure, and an Ontario bridge abutment. All four field trials were successful. This report discusses the results of these trials. (Copyright (c) 1993 National Academy of Sciences.)
Electrochemical Chloride Removal and Protection of Concrete Bridge Components: Field Trials
J. Bennett (Autor:in) / K. F. Fong (Autor:in) / T. J. Schue (Autor:in)
1993
161 pages
Report
Keine Angabe
Englisch
Highway Engineering , Construction Equipment, Materials, & Supplies , Corrosion & Corrosion Inhibition , Transportation & Traffic Planning , Transportation , Reinforced concrete , Highway bridges , Corrosion inhibition , Columns(Supports) , Electrolytes , Field tests , Chlorides , Electrochemical corrosion , Bridge abutments , Bridge maintenance , Highway maintenance , Dams , Electrochemical cleaning