Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cle Elum Dam Juvenile Pit Tag Fish Bypass System Report: Storage Dam Fish Passage Study, Yakima Project, Washington
This report was prepared for the Bureau of Reclamation under contract number 05CP1001587 to recount the installation and fish test of the PIT Tag detection system at the juvenile exit flume located at Cle Elum Dam. The components of this report are: (1) Describe and review the installation of the PIT Tag detectors as well as provide suggestions for modifications to the system based on data collected this year. (2) Review the fish test process, results, and conclusions.
Cle Elum Dam Juvenile Pit Tag Fish Bypass System Report: Storage Dam Fish Passage Study, Yakima Project, Washington
This report was prepared for the Bureau of Reclamation under contract number 05CP1001587 to recount the installation and fish test of the PIT Tag detection system at the juvenile exit flume located at Cle Elum Dam. The components of this report are: (1) Describe and review the installation of the PIT Tag detectors as well as provide suggestions for modifications to the system based on data collected this year. (2) Review the fish test process, results, and conclusions.
Cle Elum Dam Juvenile Pit Tag Fish Bypass System Report: Storage Dam Fish Passage Study, Yakima Project, Washington
2005
15 pages
Report
Keine Angabe
Englisch
Cle Elum dam, Yakima project, Washington
Engineering Index Backfile | 1931