National Program for Inspection of Non-Federal Dams, Merrymeeting Lake Dam (NH 00342), Merrimack River Basin, New Durham, New Hampshire. Phase I Inspection Report
The dam is an earth embankment structure. The dam is 286 ft. long and 22 ft. high. The condition of the dam is fair in spite of a continued history of seepage through the dam that has not been eliminated by refacing the upstream side of the dam. The estimated PMF would overtop the dam by 6.6 ft. (Author).
National Program for Inspection of Non-Federal Dams, Merrymeeting Lake Dam (NH 00342), Merrimack River Basin, New Durham, New Hampshire. Phase I Inspection Report
The dam is an earth embankment structure. The dam is 286 ft. long and 22 ft. high. The condition of the dam is fair in spite of a continued history of seepage through the dam that has not been eliminated by refacing the upstream side of the dam. The estimated PMF would overtop the dam by 6.6 ft. (Author).
National Program for Inspection of Non-Federal Dams, Merrymeeting Lake Dam (NH 00342), Merrimack River Basin, New Durham, New Hampshire. Phase I Inspection Report
1978
129 pages
Report
Keine Angabe
Englisch