Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge Deck Preservation Procedures for the Arizona Department of Transportation
The primary objective of this project is to identify several common bridge deck maintenance activities that are performed by contract, review the current Arizona Department of Transportation (ADOT) specifications for those maintenance activities, modify the specifications where appropriate to reflect current accepted practice, and to serve as a model to guide future efforts at updating specifications. To complete the project, all of ADOT's bridge deck maintenance specifications were reviewed. The following repairs were identified for further evaluation: temporary repair of expansion joints; minor collision damage repair of concrete I-beam girders; hole in deck repair (with and without asphalt overlay); and bridge railing repair (concrete and aluminum). Bridge preservation specifications from other agencies were then collected and reviewed. This led to the selection of two treatments to develop new draft specifications: bridge Deck Repair: Full-Depth Patch and prestressed Concrete I-Beam: Minor Repair by Patching and Epoxy Resin Base Adhesive Injection. Draft specifications were developed and submitted to ADOT for review and possible implementation, thereby completing the project.
Bridge Deck Preservation Procedures for the Arizona Department of Transportation
The primary objective of this project is to identify several common bridge deck maintenance activities that are performed by contract, review the current Arizona Department of Transportation (ADOT) specifications for those maintenance activities, modify the specifications where appropriate to reflect current accepted practice, and to serve as a model to guide future efforts at updating specifications. To complete the project, all of ADOT's bridge deck maintenance specifications were reviewed. The following repairs were identified for further evaluation: temporary repair of expansion joints; minor collision damage repair of concrete I-beam girders; hole in deck repair (with and without asphalt overlay); and bridge railing repair (concrete and aluminum). Bridge preservation specifications from other agencies were then collected and reviewed. This led to the selection of two treatments to develop new draft specifications: bridge Deck Repair: Full-Depth Patch and prestressed Concrete I-Beam: Minor Repair by Patching and Epoxy Resin Base Adhesive Injection. Draft specifications were developed and submitted to ADOT for review and possible implementation, thereby completing the project.
Bridge Deck Preservation Procedures for the Arizona Department of Transportation
J. E. Bruinsma (Autor:in) / D. G. Peshkin (Autor:in)
2006
46 pages
Report
Keine Angabe
Englisch
Laminated timber bridge deck developed in Arizona
Engineering Index Backfile | 1943
|Steel lattice girder bridge deck transportation device
Europäisches Patentamt | 2023
|British Library Conference Proceedings | 1993
|British Library Online Contents | 1993
|