Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
National Program for Inspection of Non-Federal Dams. Robertson Dam (NH 00276), NHWRB Number 255.02, Connecticut River Basin, Winchester, New Hampshire. Phase I Inspection Report
The dam is a run-of-the-river dam consisting of a rock filled timber crib overflow section capped with a 10 inch thick concrete slab. It is 150 ft. long with a maximum height of 17 ft. The maximum storage capacity at top of dam is 112 acre ft. The dam is considered to be in poor condition. The dam is small in size with a significant hazard potential. (Author).
National Program for Inspection of Non-Federal Dams. Robertson Dam (NH 00276), NHWRB Number 255.02, Connecticut River Basin, Winchester, New Hampshire. Phase I Inspection Report
The dam is a run-of-the-river dam consisting of a rock filled timber crib overflow section capped with a 10 inch thick concrete slab. It is 150 ft. long with a maximum height of 17 ft. The maximum storage capacity at top of dam is 112 acre ft. The dam is considered to be in poor condition. The dam is small in size with a significant hazard potential. (Author).
National Program for Inspection of Non-Federal Dams. Robertson Dam (NH 00276), NHWRB Number 255.02, Connecticut River Basin, Winchester, New Hampshire. Phase I Inspection Report
1980
90 pages
Report
Keine Angabe
Englisch