Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
National Program for Inspection of Non-Federal Dams. Goose Pond Dam (MA 00312). Housatonic River Basin, Tyringham, Massachusetts. Phase 1 Inspection Report
Goose Pond Dam is about 285 ft. long and 27 ft. high. The facility is considered in fair condition. Based on the intermediate size and high hazard potential, the flood test is the Probable Maximum Flood. Investigations are recommended to determine the stability of the embankment and the effect of seepage.
National Program for Inspection of Non-Federal Dams. Goose Pond Dam (MA 00312). Housatonic River Basin, Tyringham, Massachusetts. Phase 1 Inspection Report
Goose Pond Dam is about 285 ft. long and 27 ft. high. The facility is considered in fair condition. Based on the intermediate size and high hazard potential, the flood test is the Probable Maximum Flood. Investigations are recommended to determine the stability of the embankment and the effect of seepage.
National Program for Inspection of Non-Federal Dams. Goose Pond Dam (MA 00312). Housatonic River Basin, Tyringham, Massachusetts. Phase 1 Inspection Report
1979
82 pages
Report
Keine Angabe
Englisch