The dam is located on Brixius Creek, a tributary of the Susquehanna River, approximately 1/2 mile north of Union, NY. The examination of documents and visual inspection of the Site 2 Dam and appurtenant structures did not reveal conditions which constitute a hazard to human life or property. The discharge capacity of the spillways is adequate for the PMF (Probable Maximum Flood). However the following remedial actions must be completed within 1 year from notification to the owner: (1) Eliminate the pedestrian traffic on the embankment and auxiliary spillway, backfill all depressions and reseed these areas; (2) repair the depressions on the upstream slope in the vicinity of the riser and beyond the downstream toe of the dam; (3) Remove the parking area from the auxiliary spillway channel and reseed the affected area; (4) Remove the vegetation from the inlet and outlet of the auxiliary spillway, and the downstream channel; (5) Investigate the conditions of the reservoir drain and restore to operational status, if required; (6) Repair the erosion or the Taft Road embankment and clean out the sediment within the 6 feet diameter highway culvert; and (7) provide a program of periodic inspection and maintenance of the dam and appurtenances, including yearly operation and lubrication of the reservoir drain system.
The dam is located on Brixius Creek, a tributary of the Susquehanna River, approximately 1/2 mile north of Union, NY. The examination of documents and visual inspection of the Site 2 Dam and appurtenant structures did not reveal conditions which constitute a hazard to human life or property. The discharge capacity of the spillways is adequate for the PMF (Probable Maximum Flood). However the following remedial actions must be completed within 1 year from notification to the owner: (1) Eliminate the pedestrian traffic on the embankment and auxiliary spillway, backfill all depressions and reseed these areas; (2) repair the depressions on the upstream slope in the vicinity of the riser and beyond the downstream toe of the dam; (3) Remove the parking area from the auxiliary spillway channel and reseed the affected area; (4) Remove the vegetation from the inlet and outlet of the auxiliary spillway, and the downstream channel; (5) Investigate the conditions of the reservoir drain and restore to operational status, if required; (6) Repair the erosion or the Taft Road embankment and clean out the sediment within the 6 feet diameter highway culvert; and (7) provide a program of periodic inspection and maintenance of the dam and appurtenances, including yearly operation and lubrication of the reservoir drain system.
National Dam Safety Program. Patterson Brixius Grey Creek Watershed Project, Site 2 (Inventory Number NY 725). Susquehanna River Basin, Broome County, New York. Phase I Inspection Report
G. Koch (Autor:in)
1980
108 pages
Report